Bristol City Centre New Metro Scheme

Bristol City Centre New Metro Scheme

Feb / 18 / 2016
  By: admin2556

Duration 8 weeks. EPS we employed to remove a 700mm thick reinforced with 32mm steel bar concrete slab


Lewins Mead Bridge removal, Bristol

Lewins Mead Bridge removal, Bristol

Aug / 12 / 2015
  By: admin2556   Tags: Drilling Demolition Track Sawing Wire Sawing

EPS Drilling were employed by Wring Group to carry out Specialist Wire Sawing, Track Sawing and Brokk Demolition